Today the windows were supposed to go in. As with everything else, they did not go as planned. We got about 3 inches of snow and I though maybe that was why. It had been blowing and stuff so I thought maybe the weather held them back. I called the builder to see if they would go in this week so they could wire the house next week. He told me the sliding glass doors just came in today and he'd like to have the crew install everything at once. He has the windows scheduled to be delivered on go in on Friday. This was very frustrating. I'm having one of those weeks where I'm just at my wits end. I'm ready to see progress on the house. I'm so tired of seeing it in the same state.
On a positive note, Reynolds Well Drilling called and they feel very good about the amount of water flow we have. We are getting 1.6 GPM. Seems a bit low to me, but I think it's probably good for the area.